null

GE RAVTRANS3 Transition Plenum for Zoneline AZ90/AZ91 to AZ95 (8" or Less Plenum Depth) VTAC Replacement Installation

Sku:
GE-RAVTRANS3
In Stock, Ships Next Business Day
$269.00
The RAVTRANS3 transition kit is required when replacing your older AZ90 and AZ91 Series VTACs with the newer AZ95 units. The RAVTRANS3 kit is to be used when replacing AZ90 and AZ91 series units with an existing RAVWPT8 wall plenum.
 
Differences in chassis designs between the AZ90/AZ91 series and AZ95 series require careful installation and planning. Changes in drain exit locations and drain routing, electrical connections, platform height, and conditioned air duct locations are all items that need to be considered when replacing an AZ90/ AZ91 series unit with an AZ95 series unit. The RAVTRANS3 will also work when replacing the Friedrich VHA units with an AZ95.
 
The kit includes the transition plenum with air divider, front bracket and screws. It is 33-7/10"h x 23-7/10"w x 9"d.
RAVTRANS3 Install diagram
 
If you are replacing an AZ75 or AZ85 with an AZ90/91 you will need a RAVTRANS. If you are replacing it with an AZ95 you will need a RAVTRANS2. If you are replacing an AZ90/91 with an AZ95 you will need a RAVTRANS3 or RAVTRANS4. 
RAVTRANS FLOW CHART
FREE SHIPPING ON ALL ORDERS!
GE RAVTRANS3 Transition Plenum for Zoneline AZ90/AZ91 to AZ95 (8" or Less Plenum Depth) VTAC Replacement Installation

Product Overview

The RAVTRANS3 transition kit is required when replacing your older AZ90 and AZ91 Series VTACs with the newer AZ95 units. The RAVTRANS3 kit is to be used when replacing AZ90 and AZ91 series units with an existing RAVWPT8 wall plenum.
 
Differences in chassis designs between the AZ90/AZ91 series and AZ95 series require careful installation and planning. Changes in drain exit locations and drain routing, electrical connections, platform height, and conditioned air duct locations are all items that need to be considered when replacing an AZ90/ AZ91 series unit with an AZ95 series unit. The RAVTRANS3 will also work when replacing the Friedrich VHA units with an AZ95.
 
The kit includes the transition plenum with air divider, front bracket and screws. It is 33-7/10"h x 23-7/10"w x 9"d.
RAVTRANS3 Install diagram
 
If you are replacing an AZ75 or AZ85 with an AZ90/91 you will need a RAVTRANS. If you are replacing it with an AZ95 you will need a RAVTRANS2. If you are replacing an AZ90/91 with an AZ95 you will need a RAVTRANS3 or RAVTRANS4. 
RAVTRANS FLOW CHART